Skip to content

Door access · biometrics · turnstiles

Access control systems and turnstile gates for UAE businesses.

Card, PIN and biometric readers on your doors, turnstiles at the entrance, and one record of who went where. We install access control like the rest of your IT: on its own network, with admin accounts in your name and updates applied. For ILLUMIN8 we fitted door access in a new factory area at its SAIF Zone site.

A Missan project engineer at the Sharjah head office
A Missan project engineer at the head office.

Talk to our team today. Mon–Sat, Dubai time.

What we do

Doors, gates and the rules behind them.

Readers, locks and turnstiles are chosen per door after the survey. We do not tie you to one access control brand.

22+ years · 5,000+ clients served since 2004 · 10,000+ projects delivered since 2004

Door access control
Card, PIN, biometric or mobile readers with electric locks, door contacts and exit buttons, wired to networked controllers.
Turnstiles and speed gates
Tripod, speed-gate and full-height turnstiles for lobbies, staff entrances and site gates, on the same system as the doors.
Access by role and time
Staff, visitors and contractors get only the doors and hours they need, and leavers are removed from every site at once.
Fire and safety integration
Escape doors released on a fire alarm signal, and fail-safe or fail-secure locks chosen per door.
Attendance and CCTV links
Door events feed attendance reports, and can be tied to camera footage where you run our CCTV.
Secured network
Controllers on their own network segment behind the firewall, default passwords changed, remote admin over VPN only.

How a project runs

Survey, fixed quote, then a staged rollout with a way back.

  1. Step 1

    Site survey

    An engineer visits, records what is installed today and what the business needs from it, before anything is priced.

  2. Step 2

    Fixed quote

    You get an equipment list, the labour, a schedule and one written price. Anything that changes on site is quoted in writing first.

  3. Step 3

    Staged rollout

    One site, floor or group at a time. The old setup stays in place, with a tested way back, until the new one is proven.

  4. Step 4

    Handover and support

    Documentation, admin access in your company’s name and a walkthrough. Then support under an AMC or managed IT if you want it.

After go-live

What access control support covers.

  • Cards, fingerprints and faces added or removed as staff join and leave.
  • Controller, reader and turnstile faults reported to our helpdesk and attended onsite.
  • Firmware and software updates applied in an agreed window, after a backup.
  • Access reports pulled when you need to review an incident.
  • Warranty claims with the vendor and part replacement.
  • Onsite visits anywhere in the UAE.

Support runs Monday to Friday 08:30–17:00 and Saturday 08:30–14:00 (Dubai time), with out-of-hours cover agreed in the contract where you need it. We reply within one business day to anything that is not urgent. See IT AMC contracts and managed IT services.

Questions

What buyers ask before they sign.

What kinds of door access control do you install?

Card, PIN, biometric (fingerprint or face) and mobile credentials, on single doors or across a building. We choose the reader and lock for each door based on how it is used, the door type and the fire-escape rules for that exit.

Do you supply turnstiles and gates?

Yes. We supply and install tripod turnstiles, speed gates and full-height turnstiles for lobbies, staff entrances and site gates, and connect them to the same access control system as the doors, so one card or face works everywhere it should.

What happens to the doors in a power cut or fire alarm?

Each lock is chosen as fail-safe or fail-secure for that door, with battery backup on the controllers. Escape doors are wired to release on a fire alarm signal, coordinated with your fire contractor.

Can access control link to time attendance and CCTV?

Usually yes. Readers can feed attendance reports and payroll exports, and door events can be linked to camera footage. See our CCTV, access control and attendance page for the combined service.

Can you manage several sites from one place?

Yes. Controllers at each site report over the network, with branch links carried on a firewall VPN, so staff access can be added or removed for every site from one console.

How is an access control project priced?

A fixed quote after a site survey: each door, its reader and lock, turnstiles, cabling, controllers, software and labour. Any change on site is quoted in writing first.

Tell us about the doors

The type of site, how many doors and entrances, whether you need turnstiles, how many staff, and your deadline. We reply within one business day.

4.6★ from 200+ Google reviews We reply within one business day
Add country and company size (optional)

No newsletter and no sales sequence. We only use this to answer you. See our privacy policy. Prefer to talk? +971 6 562 6006 or WhatsApp us

Planning a project? Get it scoped first.

Send us the brief, the deadline and what you have today. An engineer reviews it and we reply within one business day with next steps.