Skip to content

Infrastructure & systems integration

IT infrastructure and systems integration: servers, storage and networks, built and looked after.

We design and install servers, SAN storage, virtualisation and the network core, migrate you across and test a restore before handover. For Indemnity Insurance Brokers that meant a new HPE server and SAN on Windows Server 2025. For IMS, a server room and network upgrade at its JAFZA head office.

Missan team members at the Missan booth 5-P01 at Make It In The Emirates 2026, ADNEC Abu Dhabi
The Missan team at stand 5-P01, Make It In The Emirates 2026, ADNEC Abu Dhabi, May 2026.

Project story

A Dell ME5024 SAN, from the box to the rack

Dell ME5024 SAN Deployment: From the Box to the Rack | Missan Project Story

1:08 · Captions on. Loads from YouTube only when you press play.

What we build

The kit in the server room, and the plan for when it fails.

Microsoft Cloud Solution Provider · Sangfor Gold Partner (Middle East) · windream Exclusive Middle East Partner · 22+ years · 10,000+ projects delivered since 2004

Servers
Physical and virtual servers from HPE, Dell, Lenovo and Supermicro, sized for your workloads with room to grow.
Storage and SAN
SAN and NAS storage for file shares, databases and ERP, with RAID and firmware set up before handover.
Virtualisation and high availability
Clustered hosts so a failed server or a patch night does not stop the business.
Backup and recovery
Backup designed in from the start, with a restore tested before go-live and a written recovery plan.
Network core and security
Firewalls, switching, segmentation and Wi-Fi, usually on Sangfor, set up with the servers rather than after them.
Migration
Virtual servers, Active Directory and file servers moved from the old platform in stages, outside working hours where possible.

How a project runs

Design, build, secure, then manage if you want us to.

Most infrastructure projects end at go-live. Ours can carry on, so the people who built it are the people who look after it.

  1. Step 1

    Design

    We look at what you run today, agree what has to stay up, and size the servers, storage and network to match. You get a written design and a fixed quote.

  2. Step 2

    Build

    Hardware is supplied, racked and configured. Migrations happen in stages, each with a way back if something goes wrong.

  3. Step 3

    Secure

    Firewall, endpoint protection and admin accounts are set up as part of the build, and antivirus goes on every server.

  4. Step 4

    Manage

    If you want, monitoring and managed IT start at handover, so the team that built it keeps it patched and reports on it monthly.

Related: backup and disaster recovery, Sangfor private cloud, managed cybersecurity and MDR and managed IT services.

Who you deal with

One project lead from the design meeting to handover.

Your IT manager or operations head has one project lead, who owns the design, the schedule and the handover documents.

The installation is done by our project engineers from our UAE head office, onsite anywhere in the UAE. After go-live, support calls go to the helpdesk and reach an engineer who has the project documentation in front of them.

We do a lot of this for manufacturers, traders and logistics firms. See trading, logistics and manufacturing IT.

Questions

What IT managers ask before an infrastructure project.

What does a systems integration project include?

Design, hardware supply, installation, migration from your current servers, security setup, backup with a tested restore, documentation and handover. Ongoing management is optional and quoted separately.

Do you supply the hardware?

Yes. We supply enterprise hardware from HPE, Dell, Lenovo and Supermicro. For Indemnity Insurance Brokers we supplied and installed a new HPE server and SAN storage on Windows Server 2025.

How do you avoid downtime during the migration?

Migrations run in stages, usually outside working hours, and each stage has a way back. The old platform stays in place until the new one has run cleanly.

How is a project priced?

A fixed quote for design, hardware and installation, agreed before work starts. Any change to scope is quoted in writing before we do it. Ongoing support is a separate monthly fee if you want it.

What warranty and support do we get after go-live?

Hardware carries the manufacturer’s warranty, which we register in your company’s name. After handover you can move to our managed IT, or take the documentation and run it yourselves.

Can you work with our existing vendors and kit?

Yes. We keep what still has life in it and replace the rest. Where another vendor runs your ERP or phones, we work with them directly.

Tell us about the project

What you are building or replacing, where, and by when. We reply within one business day.

4.6★ from 200+ Google reviews We reply within one business day
Add country and company size (optional)

No newsletter and no sales sequence. We only use this to answer you. Prefer to talk? +971 6 562 6006

Planning a project? Get it scoped first.

Send us the brief, the deadline and what you have today. An engineer reviews it and we reply within one business day with next steps.