Skip to content

Server rooms · racks · UPS

Server room, rack and UPS installation for UAE offices and sites.

A server room fails on the boring things: a tired UPS battery, a hot cupboard, cables nobody can trace. We survey the room, fix the power and the rack, and set servers to shut down cleanly in a long outage. For IMS we built the server room at its JAFZA head office.

Eight Missan team members on the Missan stand at Make It In The Emirates 2025, ADNEC Centre Abu Dhabi
The Missan team on the company’s stand at Make It In The Emirates 2025, ADNEC Centre Abu Dhabi, May 2025.

What we do

Power, racks, cooling and cables you can trace.

We supply, install and support UPS units from vendors including APC.

22+ years · 5,000+ clients served since 2004 · 10,000+ projects delivered since 2004

UPS sizing and supply
Load measured from the real equipment, with runtime agreed and spare capacity for growth.
Automatic shutdown
Servers and storage shut down in order before the batteries run out, with an alert to our helpdesk.
Racks and cabinets
Floor-standing racks or wall cabinets, with power distribution, shelves and blanking panels.
Cable management
Patching redone and labelled at both ends, so a fault can be traced without unplugging things.
Cooling and environment
Temperature and airflow checked, with a sensor that alerts before the room overheats.
Access
A lock and a record of who can get in, which auditors and insurers often ask for.

How a project runs

Survey, fixed quote, then a staged rollout with a way back.

Power work is done after hours, one circuit at a time, with equipment kept running on temporary power where needed.

  1. Step 1

    Site survey

    An engineer visits, records what is installed today and what the business needs from it, before anything is priced.

  2. Step 2

    Fixed quote

    You get an equipment list, the labour, a schedule and one written price. Anything that changes on site is quoted in writing first.

  3. Step 3

    Staged rollout

    One site, floor or group at a time. The old setup stays in place, with a tested way back, until the new one is proven.

  4. Step 4

    Handover and support

    Documentation, admin access in your company’s name and a walkthrough. Then support under an AMC or managed IT if you want it.

After go-live

What server room support covers.

  • UPS and battery health monitored, with alerts on mains failure or battery faults.
  • Battery tests on a schedule and replacements quoted before they fail.
  • Room temperature alerts routed to our helpdesk.
  • Rack changes and new equipment installed as support requests.
  • Onsite visits anywhere in the UAE from our UAE head office.

Support runs Monday to Friday 08:30–17:00 and Saturday 08:30–14:00 (Dubai time), with out-of-hours cover agreed in the contract where you need it. We reply within one business day to anything that is not urgent. See IT AMC contracts and managed IT services.

Questions

What buyers ask before they sign.

Which UPS brands do you supply?

We supply, install and support UPS units from vendors including APC, sized from the actual load of the equipment they protect, with battery runtime agreed with you.

How long should the UPS keep things running?

Long enough to ride through short power cuts and shut servers down cleanly in a long one. For most offices that is 10 to 30 minutes. If you have a generator, the UPS only needs to cover the switchover.

Can servers shut down automatically when the power goes?

Yes. The UPS is connected to the servers and storage so they shut down in the right order before the batteries run out, and alert our helpdesk when it happens.

Our comms room is a cupboard. Is that a problem?

Often it is fine if it has cooling, a lock and tidy cabling. We check temperature, airflow, power and access, and recommend the smallest change that fixes the risk.

When do UPS batteries need replacing?

Typically every three to five years, sooner in a hot room. We record install dates, run battery tests and quote replacements before they fail.

How is a server room project priced?

A fixed quote after the site survey, covering racks, UPS, power distribution, cooling recommendations, cabling tidy-up and labour.

Tell us about the room

What is in the rack, how old the UPS is and whether the building has a generator. We reply within one business day.

4.6★ from 200+ Google reviews We reply within one business day
Add country and company size (optional)

No newsletter and no sales sequence. We only use this to answer you. Prefer to talk? +971 6 562 6006

Planning a project? Get it scoped first.

Send us the brief, the deadline and what you have today. An engineer reviews it and we reply within one business day with next steps.