Skip to content

Construction IT solutions, UAE

Construction IT for head office, site offices and project teams.

We set up site office networks, keep drawings in one place with the right permissions, back up project data and run a helpdesk for office and site staff. For Spatial Composite Solutions in Ras Al Khaimah we moved engineering files from Dropbox into SharePoint and upgraded every designer workstation to SOLIDWORKS 2026.

Case studies: Spatial Composite Solutions (engineering files and design software) and ILLUMIN8 (offices, a factory and a warehouse with weekly site visits). 5,000+ clients served since 2004.

What goes wrong

Site teams need the same IT as head office.

Contractors work across permanent offices, temporary site offices and people on the move. Three problems come up again and again.

Site connectivity
A new site office needs internet, Wi-Fi and VPN back to head office within days of mobilisation, and it needs taking down cleanly at handover.
Drawings and approvals
Drawings, RFIs and approvals move between head office, consultants, subcontractors and site. Shared drives and personal Dropbox accounts lose track of the current revision.
Deadlines
When the file server, email or the estimating PC stops, the programme slips. Backups and a known escalation path matter more than the brand of laptop.

What we look after

Offices, branches and project sites under one contract.

When an IT problem is holding up a project, you call one team and it gets escalated to an engineer within your first-response target.

Helpdesk and onsite support
One number for office and site staff, with engineers sent out across the UAE when remote work will not fix it. Available as managed IT or an AMC.
Site and branch networks
Firewalls, Wi-Fi, VPN and remote access, set up the same way at every office, camp and site cabin.
Microsoft 365 and project files
Exchange, Teams, SharePoint and OneDrive, with folder permissions so subcontractors see their package and nothing else.
Security
Endpoint protection, email filtering, MFA and admin-account hygiene on every laptop that leaves the office.
Backups
File servers, project folders and accounting data backed up, checked daily and restored on a schedule.
Document control
Approval workflows and audit trails with windream, when a project or client contract asks for it.

How we start

Four steps, in this order.

  1. Step 1

    Survey

    We list your offices, sites, users, devices and where project files live today.

  2. Step 2

    Standard build

    One firewall, Wi-Fi and laptop setup that we repeat for every new site office.

  3. Step 3

    Files moved

    Project folders moved into SharePoint with permissions by team, as we did for Spatial Composite.

  4. Step 4

    Support live

    Office and site staff raise tickets with us. You get a monthly report.

Opening a new head office or yard? See new office IT setup.

Best fit

Contractors, developers and engineering firms.

Construction and contracting businesses, developers, engineering teams and multi-site operations across Dubai, Sharjah, Abu Dhabi and the rest of the UAE, since 2004.

Browse every sector Missan serves on the industries overview.

Tell us about your sites

Head office, site offices, camps: how many, where, and what connectivity they need. We reply within one business day.

4.6 on Google · 200+ reviews UAE company since 2004 Replies within 1 working day

No newsletter and no sales sequence — this is only used to answer you. Prefer to talk? +971 6 562 6006

Find out where your IT stands.

The free IT health check (AED 1,800 value) is a one-session review of your support, security, Microsoft 365 and backups. You get a written list of what to fix first.