windream · Exclusive Middle East Partner
Construction document control in the UAE: project files, drawings and email on windream.
A claim lands a year after handover, and the site instruction that matters is in the inbox of an engineer who has left. Two revisions of the same drawing are in use on site. The QS asks for every RFI on a project and waits a week. On windream, each project has one file for its drawings, RFIs, correspondence and email.
Missan’s own group of companies runs its finance document approvals on windream, with more than 150,000 documents (as of August 2026). Emirates Industrial City on going paperless with windream (video)
Does this sound familiar?
Five things that hurt at claim time.
- Project email lives in personal inboxes and leaves with the person.
- Old drawing revisions stay in circulation.
- RFIs, site instructions and variations are filed differently on every project.
- The paper archive of finished projects is overflowing.
- A claim or a handover depends on one person remembering where things are.
Who is involved
From the document controller to the site.
| Who | What they do | What they get |
|---|---|---|
| Document controller | Does: Files drawings, RFIs, transmittals and letters with their type, revision and date. | Gets: One structure for every project. |
| Project manager and site team | Does: Find documents in the office or on a tablet. | Gets: The current revision, with earlier ones kept. |
| Commercial and QS | Does: Prepare variations and claims. | Gets: Every letter and email on a project, in one place. |
| Management | Does: Approves payment applications and variations. | Gets: A record of each decision, kept with the document. |
| IT, yours or Missan | Does: Runs the system and the email archiving rules. | Gets: Your own servers or a private cloud in the UAE. |
How it works for this need
One project, one file.
-
Step 1
Open the project file
One electronic file per project, indexed by project number, client and contract.
-
Step 2
File drawings and RFIs
Saved or scanned with their type, revision and date.
-
Step 3
Archive project email
Email and attachments filed from Outlook to the project, by hand or by rule.
-
Step 4
Keep every revision
A new revision becomes a new version. Earlier ones stay for the record.
-
Step 5
Find it on site
Search by project number, type or any word inside, on a PC or a tablet.
The demo shows an approval and the filing, finding and keeping steps on sample finance documents; ask about the rest of these steps in the demo. Book a 30-minute demo.
Where it fits
Your own archive, beside the project tools.
Many contractors share a project platform with the client and consultants. windream is the company’s own record beside it: what you sent, what you received, and the email around it, still there when the project ends.
If project teams work in Microsoft Teams, chats and files can be archived into windream, outside the Microsoft cloud. For site networks and the rest of your IT, see construction IT.
A second example
A construction group in Switzerland scans about one million new documents a year at a central workstation, and every site searches by project or customer number.
Published by the vendor, retold with the name withheld. Not a Missan project.
Read the exampleRecord keeping
What UAE law asks you to keep
General rules for a contractor’s business records. Construction-specific periods, such as liability periods, are for your legal adviser; we have not summarised them.
| Records | How long, or how | Law and article |
|---|---|---|
| Tax records: accounting records, invoices, contracts, payroll and supporting correspondence | 5 years after the end of the tax period (for a business that is not a taxable person: 5 years from the end of the year the document was made) | Executive Regulation of the Tax Procedures Law (Cabinet Decision 74 of 2023, as amended by Cabinet Decision 17 of 2026), Arts 2 and 3 |
| Commercial books, and copies of correspondence and invoices sent and received | Books: 5 years from the date the book is closed. Correspondence and invoices: 5 years from issue or receipt | Federal Decree-Law 50 of 2022 (Commercial Transactions), Arts 25, 28, 29 and 30 |
| Corporate tax records | 7 years after the end of the tax period | Federal Decree-Law 47 of 2022 (Corporate Tax), Art 56 |
| Any document a law requires you to keep, stored electronically | The period the underlying law sets. Electronic storage counts if the record keeps its original format (or one that represents it accurately), can be used later, and keeps its origin, destination, date and time | Federal Decree-Law 46 of 2021 (Electronic Transactions and Trust Services), Art 6 |
Last checked 11 November 2026. This is a summary for orientation, not legal advice. Your adviser decides the periods that apply to you; we set them up in the system.
An example · Construction, more than 500 staff
A construction company in Germany keeps an electronic construction file per project in windream. Email archiving watches 500 mailboxes and files every message with no manual step, so files are found by project instead of in paper archives.
A windream customer as published by the vendor on its own website, retold in our words with the name withheld. Not a Missan project.
Read the exampleBook a demo
What you will see in the demo, and what we will talk through.
- Seen on screen: an approval flow on sample finance documents. A supplier invoice, purchase order or payment request is assigned to an approver, who reviews it from a task list, adds a stamp, a signature and a comment, then approves or rejects it, and the decision is recorded. A variation or a payment application would follow the same kind of flow.
- Seen on screen: how the approved document is filed, found again by field or by text, and kept for the period you set; then where it runs, on your own servers or a private cloud in the UAE run by Missan.
- Talked through, not shown: how your project files, drawings and RFIs would be set up: document types, index fields, who may open what, and the approval routes. This part is a conversation with your own process in mind, not a screen of sample construction documents.
The demo uses sample documents, not yours. It takes about 30 minutes, online or at your office in the UAE.
Ask for your demoQuestions
What buyers ask us.
Does windream replace our project collaboration platform?
No. Platforms you share with the client and consultants keep running. windream is your company’s own archive of what was sent and received, with the email around it, kept after the project ends.
Does it do BIM or clash detection?
No. windream keeps documents, drawing files, email and approvals. Models and clash detection stay in your design tools.
Can it archive every project mailbox?
windream archives email and attachments from Outlook and Office 365 by rule. One vendor-published example archives 500 mailboxes this way. We agree which mailboxes and rules in the survey.
Can site staff open files on a tablet?
Yes. The windream Dynamic Workspace runs in the browser and as an app on iOS and Android, with the same rights as on the office PC.
Where would project files be stored?
On your own Windows servers, or in a private cloud in the UAE hosted and managed by Missan. We agree in writing where documents and backups sit.
Book a windream demo
Tell us how many live projects you run, how project email is kept today, and which project tools you use. We reply within one business day to set a time.
See an approval flow in 30 minutes, then talk through your project files.
Online or at your office in the UAE. We reply within one business day to set a time.